LNG Technical Knowledge Library
Marine & TransferIntermediate
LNG Vapor Return Systems
Study how vapor is returned between ship and shore during LNG transfer to manage displacement vapor and pressure.
System context
Ship-shore vapor balance
Technical topic pages show the knowledge scope behind LNG University learning. Course, assessment and credential availability depends on the applicable program.
Relevant roles
Marine operators · Jetty operators · Control-room personnel · Process engineers
Prerequisites
LNG loading arms · BOG management
Knowledge level
Intermediate technical coverage with system and operational context.
Learning outcomes
What this topic is intended to help you understand
- Explain why vapor return is needed during transfer.
- Trace typical vapor-return routing and connected equipment.
- Recognize the interaction between ship pressure, shore BOG capacity and transfer rate.
Technical scope
Equipment, concepts and terminology
- Vapor return arms
- Vapor headers
- Ship-shore pressure balance
- BOG compressors
- Isolation valves
- ESD interfaces
Operating context
How the topic connects to plant operation
- Pre-transfer line-up
- Pressure monitoring
- Transfer-rate coordination
- Response to vapor-return limitations
Safeguards and controls
Protection and risk-control context
- Ship-shore ESD
- Pressure limits
- Gas detection
- Emergency release coordination
Technical learning does not replace site procedures, OEM documentation, engineering calculations, permits, supervision or facility-specific authorization.
Engineering documents
Documents commonly connected to this subject
- Jetty P&ID
- Transfer procedure
- ESD cause & effect chart
- Marine terminal manual